BCO 2026_Entry Guide v4 - (final) - Flipbook - Page 15
DESIGN AND ACCOMMODATION
PROJECT COSTS & AREAS To be completed online
Total costs: Shell & Core ONLY (in £)
(Enter amount)
B1. BCO Guides
Total costs: CAT A ONLY (in £)
(Enter amount)
Total costs: CAT B ONLY (in £)
(Enter amount)
> How have you utilised the BCO Guide to
Specification, BCO Guide to Fit Out and / or other
BCO research (Briefing Notes, Reports)?
Area: GIA in sq ft
(Enter amount)
> Where have you deviated from them?
Area: NIA in sq ft
(Enter amount)
B2. General Arrangements
Base date (month/year)
(Enter date)
Based on the figures entered above the system will auto-calculate
the two tables below:
£/GIA
£/m2
£/ft2
> Please describe all relevant aspects from use of site
to context, internal planning and circulation.
B3. Internal Environment
> What drove the approach to the reception, common
areas, user controls, lighting, daylight and integration
/ connection to the exterior.
Shell & core ONLY
B4. Internal Spaces (if applicable)
CAT A ONLY
> Please describe the approach to workplace from
space planning to finishes, facilities, signage
and security.
Sub-total
CAT B ONLY
B5. Building Facilities, Build Quality, Durability and
Maintenance
TOTAL
£/NIA
£/m
2
£/ft
2
CAT A ONLY
CAT B ONLY
TOTAL
Please provide any additional cost detail
as necessary and highlight any specific key
cost drivers / abnormal costs below:
> What was your approach to quality, longevity
of construction / finishes, maintenance and
management?
> What measures were included to optimise cost
in use?
B6. Building Connectivity and Intelligence
> How well connected is the building, does it have
dual entry points, mobile boosting, WiFi to
common areas?
> Has a Wiredscore rating been achieved?
> Have you utilised any intelligent building technology?
> Is there a building app?
15